| Re: Bad-Ass Engines I have to agree with mark and JP. Arron at Bad-Ass is building my engine now and he had indicated that after the 20 minutes initial brake in and the subsequent tweaks, the motor can and should be “loaded up”!
Besides, the whole reason for building this motor was to brake half shafts and CV joints (hopefuly not the trany)!!
[img]/ubbthreads/images/graemlins/grin.gif[/img] [img]/ubbthreads/images/graemlins/grin.gif[/img] |