| Re: GT90 from ground up Some more pics and very brief descriptions
Front wheel arches added suspension/steering geometry and clearances checked
Nostrils and front cover cut free from stations
A lot of cleanups and edges added in prep for mesh
"radiator" inplace for sizing, clearances and airflow.
At this point each small step was taking days, lots of fiddly stuff
Starting to look like the real thing.
This concludes the history, doors next. |