| Re: SteveB MDA MKII Build Diary Progress is two steps forward and one back, the engine has bee in place several times to place pipe and wiring positions. There's a shot of the empty compartment reay for the engine and gearbox fit ( last time I hope).
I changed the heater pipes from the center section to pass down the LH sill, his gave a little more clearance for the crank pulley that is very low and forward as I'm using a ZF .
The dash is set out and wired, I am waiing for a chrome bezel speedo to match the SW instruments.
The doors have lots of wires for the electric mirrors/ heated mirror central locking and courtsey light switches etc, some closed cell pipe insulation fixed with some dabs of Sikaflex made a nice way of stoping them rattling about.
I am aiming for a driveable chassis then tackle the body
Steve |