Hi all, I can get around this problem but thought I'd ask anyway.
I'm at the stage on my SGT Build where the door top stainless guides are fitted to the inside of the doors and the other half to the roof of the spider. BUT the roll cage is right where the other plates are to go, there's no room at all to fix.
I can drill down through the roof of the spider, fix and then fill in at the paintwork stage.
What say you ?