Hi all, started the build on the new southern gt in Jan this year and making good progress.
Hoping to have it ready for SVA / IVA around October and in paint over the winter.
So far chassis is all panelled, suspension 90%, steering finished, brake and clutch lines,pedal box 80%, all water pipes and radiator modified and in,fuel tanks and pumps in, loom 50%in. I'm pleased with the progress so far and Mick at Southern seems to keeping me supplied with the parts as and when I need them. Not much to complain about really , well done Mick.
Waiting for the AP brakes at the moment.
Just picked up the air con and other bits
Will get some photos on shortly, this is planned to be a relatively quick build so the photos will be flowing thick and fast.
Going on Holiday for a week tommorrow in the sun to read about cars, life couldn't be better !
Spec... Southern GT chassis
Knight racing services @ Daventry 450 H.P engine ... on build as we speak
Wicked fuel injection system
ZFQ ... sitting in the workshop ready
Hoping to have it ready for SVA / IVA around October and in paint over the winter.
So far chassis is all panelled, suspension 90%, steering finished, brake and clutch lines,pedal box 80%, all water pipes and radiator modified and in,fuel tanks and pumps in, loom 50%in. I'm pleased with the progress so far and Mick at Southern seems to keeping me supplied with the parts as and when I need them. Not much to complain about really , well done Mick.
Waiting for the AP brakes at the moment.
Just picked up the air con and other bits
Will get some photos on shortly, this is planned to be a relatively quick build so the photos will be flowing thick and fast.
Going on Holiday for a week tommorrow in the sun to read about cars, life couldn't be better !
Spec... Southern GT chassis
Knight racing services @ Daventry 450 H.P engine ... on build as we speak
Wicked fuel injection system
ZFQ ... sitting in the workshop ready