Made mounts and tabs for the shifter, hand brake lever, and center tunnel / console.
I expect to have room and run the waterlines (both radiator, heater & bleed lines) through the center spine and AC, electric and brake & throttle lines/cable in the space under the console cover (to be fabricated).