Finally managed to get the floor fitted yesterday. Started by insulating the tunnel with floor and tunnel shield from thermo tec. I then wrapped both pipes in Thermo Gaurd FR double sided. This gave a really good snug fit of the pipes in the tunnel. I then applied sikoflex to the chassis then with my neighbours help lifted the floor in position. Some more rivetting will be required as some were too short where the floor support is and where the pedal unit fits so I have temporary ally rivets in place at the moment. Will turn the chassis over early next week and begin the panelling.
Will post some pictures tomorrow.
Will post some pictures tomorrow.