Recent content by christian_Ka

  1. C

    Chris`s GT40 journey..

    The actual stage of my built, floor done, now working on metalsheeting an details.
  2. C

    Chris`s GT40 journey..

    Thats where iam after 6 month building....:cool:
  3. C

    Front upper and lower wishbones needed

    A pic with some dimension would help a lot ! thanks
  4. C

    Front upper and lower wishbones needed

    Hi, the uprights i have are mk2 granada :) laying around here for years ..., the chassis is all my design and at this stage where iam now iam flexible in fitting. Thanks chris
  5. C

    Front upper and lower wishbones needed

    Hi @ all, Searching for a full set of wishbones, for gt40 mk1 front (lower/upper). Maybe from gtd, kva, tornado, etc. Good Used condition is okay! Pls. Make an offer if you can help. Thanks so much Chris
  6. C

    Front wishbones top and lower needed

    Hi @ all, Searching for a full set of wishbones, for gt40 mk1 front (lower/upper). Maybe from gtd, kva, tornado, etc. Good Used condition is okay! Pls. Make an offer if you can help. pics of my actual construction stage, all done myself. Thanks Chris
  7. C

    Chris`s GT40 journey..

    My build now also available at namak-sportcars.de, will post more content there, plus videos in next days.
  8. C

    Chris`s GT40 journey..

    Yes... here are some pics of the cutted wood pieces
  9. C

    Chris`s GT40 journey..

    yes..., not the only car wich hes making
  10. C

    Chris`s GT40 journey..

    Well three weeks ago, i picked up my body at bongarini composites in France, went with it to Le-Mans and drove over the racetrack with my trailer loaded dream. And my build will start ....lets make it real...
  11. C

    Chris`s GT40 journey..

    My rough version of doorhinges - now bringing them to right shape
  12. C

    LH drive dash top photos

    here it is
  13. C

    Chris`s GT40 journey..

    Well it works out... 90% done with my chassis. Ordered last week my bodykit in France at Bongarini Composites. Will be ready for pickup in 5 weeks approx. When I pic up the Body, i will check all measurements again, to compare body with my drawings, than i start cutting all metal sheets on my...
Back
Top