Today, I dropped the floor pan 1.25"
It was some much needed practice. That's about 25' of weld.
I also glassed the back of the modded set. I have a space heater running under it tonight, so I'll be set up hard my mid day tomorrow. Now I will have the seat in position so I can proceed with steering column length and pedal locations.
I'm not really proud of those welds, but they'll hold for sure. I was never that good with aluminum. For some reason with AC, I can't keep from dipping the tungsten in the puddle or tapping it with the filler. But the new 250A welder with the water cooled torch is a hause. It ran 150A 100% duty cycle for 10 minutes straight and the torch stayed cool to the touch... at least on the non business end.