My garage superstructure construction starts a week today and will finish in three weeks time. I have been advised by my freinds in the know that I will have to wait a minimum of 1 month to let the floor dry out having been exposed to rain etc for a while. Then they shall supply me with 8 gallons of two pack epoxy floor paint which they regualrly use in warehouse applications. Sounds similar to what is discussed above.
Roy had special floor tiles down but he always seemed to be cursing them. I think he lifted them? Maybe Paul can enlighten us?
Has anyone used a masonry sealer beneath the epoxy paint after acid etching?
Malcolm
Roy had special floor tiles down but he always seemed to be cursing them. I think he lifted them? Maybe Paul can enlighten us?
Has anyone used a masonry sealer beneath the epoxy paint after acid etching?
Malcolm