The dash is APITA, work going slow there. After stripping the chassie down I mounted the brake/clutch reservoir's, centered the stering colum, and wrapped the coolant lines then reinstalled in the spine. I Lizzard skined the chassie to keep some of the noise down I'm hope it works better than dyna mat that I put in the Lotus. I got the suspension rods back from the powder coater, and the billet suspension parts back from the anodizer. I now have a rolling chassie again.
Dash is now in third location as doors would not close dash roll bar issue
Body alignment
After reading all the issues with everyone having alignment issue's like the dash for me I just half way mounted the doors, front clip, spider and rear clip. Then used my motorcycle tie downs to hold the rear clip against the spider this leaves everything in a fluid state. Then using plenty of gorilla duct tape to hold everything in place I marked the spider rear location and tightened the rear clip hindges. I half way aligned the doors and front clip. I removed the body made a permanate mounting for the spider then reassembled the body and once again used tie down to secure the rear clip to the roll cage to reset the rear hindges. I thought this would take two weeks but only took two days.