DRB # 64 full re build

Hi all,

Just an update on DRB #64.

I have nearly completed a full brake and engine build on DRB #64. I have plans on re doing a lot of the interior to complete the re build.

I anticipate it will be back on the road/track within six weeks - mid February.

Bernie
 
Craig

Will have it there for sure. Just a drive up and sort out on the way. Built too drive now, don't think I will have the time to enter.
 
Back
Top