If CAV sets your #180 up as well as they did with my #8 it will be running in only a few days. Two guys in So. Carolina had mine running in 3 days and I took it home on the forth day. This was after the trans. and motor was built which was ready when the roller was delivered. It went together like a tinker toy. I never had a bit of problems with it. It started EVERY time like a brand new Toyota even after sitting for 3 months during the winter.
JOSEPH
PS: Here is a picture of it that the new owner sent me.
JOSEPH
PS: Here is a picture of it that the new owner sent me.
Attachments
Last edited: