Hi Guys, I have been working away this week on the Tub and have progressed quite well. Started by getting the 1.6mm and 1.2mm sheets from local supplier, then marked and cut the floor plan in 3 parts, (centre, 2 side pods) then mad the sides of the cockpit and front bulk head. This is all 1.6mm sheet. The only steel in the tub is the rear bulkhead and the uprights that anchor the front of the rear suspension trailing arms and the engine front mounting plate will also be mounted to these. The side pod bulkheads were then folded up from 1.2mm sheet these are then glued together back to back for added stength an also this gives a much better flange to clue and rivet to the floor, sides and top panels. I have attached some pics so please feel free to comment. This will be it for this time home as I'm off to work again on Tuesday.
Cheers Leonmac