It's been a while since I've posted. I been working on the car almost every day. Make progress in areas and then wait for parts and move to another area. The splitter has been relocated to the top, fuel tank modified for the in-tank fuel pump system, all brake lines are remade and finished, brake, clutch and lift reservoirs are installed and connected, radiator and condenser installed, lift pump installed, water lined fabricated and installed and battery placed. Moving to the cockpit--access hole for the fuel pump and fuel level indicator cut, fuel tank, fuel pump and fuel level indicator installed. Electric power steering brackets fabricated and powder coated (will provide photos later- don't want them in the way for now). New RCR shifter installed and cables run to engine room. Now I am mocking up the dash to the spider checking for room for the defrost tubing to A/C unit Glassed up a trough using a metal rod and water pipe insulation as the shape. Matched the curve of the trough to the curve of the defrost slots in the dash and glassed it up. I will tab it on to the dash and make a transition to the defrost ports coming through the dash. The A/C unit is mounted and hoses run except for the 2 going to the rear.
The Graziano is on its way to have the drop gears installed. Reversed the intake on the engine, mounted the A/C compressor and engine wire harness.