I had a very busy day on the SL-C.
Added coolant, relocated hot water divertor valve, secured pedal assembly, attached accel pedal harness, attached all remaining engine harness connections, temporarily connected the engine breather hoses, fabricated a harness to attach to the GM bulkhead harness, tightened lower bulkhead panel and tighten exhaust collector flanges.
Im preparing to install the fuel tank and tighten the straps, route/terminate the harness for the fuel pump and fuel level sending unit.