Brake lines etc in. Gone for hardlines from the reservoirs to the master cylinders so I can avoid the steering UJ. Fabricated a cover for the washer bottle and hood for the fuse boxes to avoid splashes.
Footwell panelling getting there, will be powdercoated eventually. Also mocked up the clutch, water and brake lines. Will wrap the water pipes and add some protection to the brake and cluth lines to avoid rubbing.
Hi Duncan, Looks like your build is progressing nicely, with some very nice details touches and it was nice to put a face to the name at the weekend<?xml:namespace prefix = o ns = "urn:schemas-microsoft-com<img src=" /><o></o> PM sent about the other issue we discussed<o></o> Regards,<o></o> Andy<o></o>