Hi There
Well today was where all the hard work came to fruition, after 5 coats of Maguires maximum protection release wax ( and yes I still did a test strip) I had laid up the door skins yesterday and after a good 18 hours curing, the moment of truth came.....they both pulled out rather easier than I expected. My inside edges on the scoops are very tight so I had used dynel cloth strip around those areas and got only one small bubble so they will need very little work to mould the actual doors from.
Very happy, I will not be able to mould the body sections for a couple of days.
Cheers
Well today was where all the hard work came to fruition, after 5 coats of Maguires maximum protection release wax ( and yes I still did a test strip) I had laid up the door skins yesterday and after a good 18 hours curing, the moment of truth came.....they both pulled out rather easier than I expected. My inside edges on the scoops are very tight so I had used dynel cloth strip around those areas and got only one small bubble so they will need very little work to mould the actual doors from.
Very happy, I will not be able to mould the body sections for a couple of days.
Cheers