Hey guys, I got the dash nailed down, the steering rack, and for those who had voiced concern about my lower suspension point being single shear i boxed it and made it double shear. I had to remount the master cylinders but the end result is more like the original and with it riveted in helps tighten up the whole front of the tub. I only need to make the rear top link mounts and that is pretty much the "Tub" persay finished. the next thing and last part of the alloy panel work to do is the Radiator pontoons and the fuel cells. No Pics sorry, I'm back at work so will get some up next time home. Cheers Leon.