So Andy, I still have to finish doing the final wiring on engine, especially the HT leads, the MSD unit and the Craig Davies WP and controller. Once that is done then probably nothing, except....
I'd prefer to get the other systems sorted and out of the way and tested first. So still need to finish doing the wipers and HVAC (I at least want to test the heat when I fire up the engine, the AC can wait until after IVA) and install a couple of circuits I need to put in (elec mirrors etc). Oh and I've decided to order a new alternator as well.